PHOTOVOLTAIC - 3.984 MW - CALARASI COUNTY, Romania

Technical Monitoring Studies

January 2021

Techinical Monitoring Study

Our technical team have provided several technical due diligence reports for Bank loan. These reports have been redacted after development & construction of the photovoltaic plant.
Our technical due diligence assesses all aspects, from design and components to construction and performance, detecting faults that impact the plant’s bankability.

In brief


We adhere to national and international standards when evaluating safety and quality, and our recommendations can help ensure high energy yield.
The review had included projectsite visits, equipment manufacturer audits, detailed equipment inspections, construction monitoring and completion verification.

By considering all the technical information, we have presented a set of conclusions and recommendations which are relevant and appropriate for the project and the parties involved.

From simulation analysis & technical survey, it was clearly observed that the project has enormous potentialities for substantially increased use of renewable energy - photovoltaic technology ; a large penetration of renewable energy sources into the national power system would reduce CO2 emissions significantly, contributing to the reduction of global warming.