We have proudly provided acomplete feasibility and technical study for the extension of an existing biogas power plant of 2 MW in Romania. Key informations such as, financial, ROI, risks, the market opportunity and legal regulations have been gathered. The aim of the study was to assess all the data in order to review the project basic criterias and properly anticipate upcoming requirements.

In brief

The project began with a simple prefeasibility study aiming to establish a clear vision on the amount of energy generated by the system, the total area required for the solar photovoltaic plant where panels to be implemented, and then, preview the economics of the whole project.

Those primary core values will offer the initial project calculation statements, which will aim to then, carefully integrate and link a power generator to the main area grid in order to meet load requirements.

It is not to mention that the legal aspect of a project represents a crucial criterion, however, legal terms and laws usually apply to all power plant engineering project and can be review prior any implementation research.

The result of the conducted study was that the plant appears to be technically, economically and financially feasible.